Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: US-51 OHIO RIVER BRIDGE REPLACEMENT STUDY. (2020CCR) Location: Route 1 Ballard County US-51 from MP 7.327 to MP 8.297 Route 2 County - from MP to MP Item #: 1-1140.00 Project Manager: KYTC\AUSTIN.HART Road Engineer: Type of Work: BRIDGE REPLACEMENT(P) Concerns:
Bridge Engineer: Bridge Structure Number: 004B00021N Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: 23 NBI Rating: Not Deficient Posting: YES |
Project Manager: KYTC\AUSTIN.HART Item #: 1-1140.00 Project Description: US-51 OHIO RIVER BRIDGE REPLACEMENT STUDY. (2020CCR) |
Milestones
|
Project Manager: KYTC\AUSTIN.HART Item #: 1-1140.00 Project Description: US-51 OHIO RIVER BRIDGE REPLACEMENT STUDY. (2020CCR) Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
CE LVL 3 | 10/18/2018 | Michael Baker International, Inc. | 10/19/2018 | 2/25/2022 | 2/25/2024 | ||
Design | Categorical Exclusion Level 3 | 10/18/2018 | Baker, Michael Jr., Inc. | 10/19/2018 | 2/25/2022 | 2/25/2024 | |
Environmental Analysis | Preliminary | 9/5/2007 |
Project Manager: KYTC\AUSTIN.HART Item #: 1-1140.00 Project Description: US-51 OHIO RIVER BRIDGE REPLACEMENT STUDY. (2020CCR) Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 1-1140.00 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\AUSTIN.HART Item #: 1-1140.00 Project Description: US-51 OHIO RIVER BRIDGE REPLACEMENT STUDY. (2020CCR) Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Utility Companies | |
Utility Name | Facility Name |
AT&T-AT&T KY | Communication |
Jackson Purchase Energy Corp | Electric |
Illinois Central Railroad Company | Railroad |
Project Manager: KYTC\AUSTIN.HART Item #: 1-1140.00 Project Description: US-51 OHIO RIVER BRIDGE REPLACEMENT STUDY. (2020CCR) |
Phase | Vendor |
D | MICHAEL BAKER INTERNATIONAL INC |
D | CDM Smith, Inc. |